MSC one-time multi-layer filling sand control technology

Technical Introduction:

Open all production layers at once, and then enter one or two sand control columns to achieve multi-layer filling and sand control. The specifications are complete and can be implemented in 5-1/2in, 7in, and 9-5/8in casing perforation wells.

Among them, 7-inch and 9-5/8-inch casing wells can achieve high-speed water filling or fracturing filling in 6 layers at once. In the later stage, cooperate with the separate mining pipe column to achieve selective mining.         

Technical advantages:

Improve homework efficiency and save homework time.

Each layer operates independently without interference between layers.

Layer by layer high-speed water filling or fracturing filling to improve the quality of borehole and annulus filling

Selective mining can be carried out in the later stage

Complete specifications, suitable for various types of sleeves.